Redevelopment of the site in the heart of Cherry Hinton to replace 16 aging homes with 48 new council rented homes and four new commercial units.
Build Programme
Start on site construction: | Q3 2022 |
---|---|
Build completion: | Q3 2024 |
Wider Benefits
- Replacement to much higher sustainability standards and a net gain of 30 units on the site, reprovision and updating of village centre shops to BREEAM.
- The homes have been designed to a Fabric First approach with increased insulation and air tightness
- Mechanically ventilated heat recovery systems in each property
- High levels of cycle storage will be included along with electrical vehicle charging points
Sustainability Features
- Heating provided through electrical Air Source Heat Pump instead of gas, providing low carbon heating.
- Green roofs which will be installed on the flat roofs to increase thermal mass and aid ecology and enhanced biodiversity on the site alongside the landscaping.
- A sustainable drainage system will aid the existing surface sewer system and allow a more even distribution of drainage.
- Rain gardens will also be created along the High Street.